Fix P3.10 documentation inconsistency
Update gap analysis note to reflect current test counts (977 unit tests across 50 files + 64 E2E tests) and complete status of all P0-P5 items. Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
@@ -1133,4 +1133,4 @@ These items were identified during gap analysis and have been completed.
|
|||||||
13. **OIDC Authentication:** P2.18 COMPLETE - Login page auto-detects OIDC via `listAuthMethods()` and shows "Sign In with Pocket-ID" button when configured. Falls back to email/password when OIDC not available. Configure OIDC provider in PocketBase Admin under Settings → Auth providers → OpenID Connect
|
13. **OIDC Authentication:** P2.18 COMPLETE - Login page auto-detects OIDC via `listAuthMethods()` and shows "Sign In with Pocket-ID" button when configured. Falls back to email/password when OIDC not available. Configure OIDC provider in PocketBase Admin under Settings → Auth providers → OpenID Connect
|
||||||
15. **Dark Mode:** COMPLETE - Auto-detects system preference via prefers-color-scheme media query (P4.3)
|
15. **Dark Mode:** COMPLETE - Auto-detects system preference via prefers-color-scheme media query (P4.3)
|
||||||
16. **Component Tests:** P3.11 COMPLETE - All 5 dashboard and calendar components now have comprehensive unit tests (90 tests total)
|
16. **Component Tests:** P3.11 COMPLETE - All 5 dashboard and calendar components now have comprehensive unit tests (90 tests total)
|
||||||
17. **Gap Analysis (2026-01-12):** Verified 889 tests across 46 files. All API routes (18), pages (7), components, and lib files (12) have tests. P0-P4 complete. Remaining gaps (Period History UI, Toast Notifications, CI Pipeline, E2E Tests) documented in P5.
|
17. **Gap Analysis (2026-01-12):** Verified 977 tests across 50 files + 64 E2E tests across 6 files. All API routes (21), pages (8), components, and lib files (12) have tests. P0-P5 complete. Project is feature complete.
|
||||||
|
|||||||
Reference in New Issue
Block a user